Central Coast Surveyors were contracted to provide survey for design and upgrade of Wyrrabalong Track at Foresters Tower.
Central Coast Surveyors have been engaged at the initial design stages for a mixed Residential and commercial development at the old water slide site at Ettalong Beach. The proposed six storey building containing 59 units with the lower floor containing retail shops. Since excavation for the basement levels are below the water table pumps are pumping out water 24hrs a day until the second floor slab is poured to have enough weight to stop the building from floating. Our field crew is performing a monitoring survey to ensure the piling caps don’t move more than 5mm.
View from Mantra Ettalong Beach Roof Top of Ground Floor Construction and from Street View.
The external construction has been completed with the aid of our set out. Central Coast Surveyors are now undertaking the Strata Subdivision while internal fit out is carried out.
Crane is to be dismantlement as Internal Fit Out is being Carried Out
Central Coast Surveyors was involved in the initial Set Out through to Strata Subdivision
Copy of the Strata Location Plan
Central Coast Surveyors has been engaged for surveying services for Gosford City Council’s four High Voltage Water Treatment Plants located at Kincumber, Woy Woy, Mooney Mooney and Mangrove Creek
Civil Directions Pty Ltd is now trading as: Central Coast Surveyors which is a fully Registered Land Surveying Company. The name change reflects our area coverage and our main service as Land Surveyors.
Central Coast Surveyors has been engaged for surveying services at the new Woolworths Service Station construction located at Lake Munmorah.
Central Coast Surveyors was awarded surveying contract from Lend Lease to provide a detail and contour plan for the development of Erina Fair’s Western Open Space Management Plan